INFRASTRUCTURE FACILITY WORKS AT NEW INTERIOR ROP CAMPS – QARN ALAM
The scope infrastructure work at new interior ROP camps in Qarn Alam & Services those executed by AAS under this contract in Sultanate of Oman. The scope of work includes Engineering, Management, Procurement, Construction, Testing, Pre-commissioning and Commissioning. List of main activities under this contract and their control measures are described below:
List of Activities to be Carried out during Infrastructure Work – ROP
- Mobilization / Demobilization
- Excavation
- Backfilling
- Thrust Boring
- HDPE pipe lying
- LV Lines
- Sewage Lifting Station
- Scaffolding Erection / WAH
- Rebar Work
- Shuttering/De shuttering work
- Block Work
- Concrete work
- Plaster Work
- Water Proofing
- Plant / Vehicle Movement
- Road Crossing – Graded Road & Black top
- Over Head Line (OHL) Crossing
- Pressure Test
- Live Pipelines Crossing